What We Do

Services

Every job below starts with the framing underneath, whether it's new construction or a fix.

HomeServices

Everything we take on

Every job below is one we do ourselves across Los Angeles.

Deck Installation

We frame new decks with pressure-treated joists set on poured concrete footings, sized to the load and span you actually need. Ledger boards get flashed and bolted, not nailed, so the connection to your house holds up to code and to weather.

Deck Repair

Soft spots, bouncy boards and a ledger board pulling away from the house are the three calls we get most. We replace what's rotted instead of screwing a new board over a bad joist, because that just hides the problem for another year.

Deck Staining & Sealing

Wood decking in L.A. takes a beating from UV, not rain, so the finish fails from sun exposure more than moisture. We sand back the old finish, let the wood dry out, and put down a stain and sealer rated for the exposure your deck actually gets.

Custom Deck Design

Multi-level decks, built-in benches, a deck that wraps around a pool, we design around how you actually use the yard rather than a stock layout. We'll tell you if a design you've seen online needs bigger beams than you're picturing.

Composite Decking

Composite boards like Trex or TimberTech cost more up front but skip the yearly staining that wood decking requires. We still frame underneath with real lumber sized for composite's extra weight, since composite runs heavier than wood per board foot.

Deck Railing Installation & Repair

Loose railings and posts that wiggle when you lean on them are a code violation, not just an eyesore. We reset posts into the framing with proper blocking and bring baluster spacing up to the 4-inch code maximum.

Deck Resurfacing

If the frame underneath is still solid, we can pull off the old decking boards and replace just the surface instead of rebuilding the whole structure. It's a faster job and a lot less money than starting from the footings up.

Deck Framing & Structural Repair

A deck that sways or feels unlevel usually comes down to undersized beams, joists spaced too far apart, or a footing that's settled. We fix the framing itself, running new beams or adding footings where the original build cut corners.

Pergolas & Deck Covers

A pergola or a solid deck cover takes a west-facing deck from unusable at 4pm in July to actually livable. We tie the structure into the deck framing itself, not just anchor it to the decking boards on top.

Deck Demolition & Removal

Sometimes the old deck is too far gone to repair and it's cheaper to start clean. We tear it out, haul the lumber off, and check the ledger and rim joist underneath for rot before anything new goes up.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Los Angeles, CA

Deck installation and repair work covers Los Angeles and the surrounding communities listed here.

Los Angeles, CA
Long Beach, CA
Anaheim, CA
Santa Ana, CA
Glendale, CA
Pomona, CA
Torrance, CA
Pasadena, CA
Inglewood, CA
Burbank, CA
Santa Monica, CA
Common Questions

Things worth asking

What tends to come up once a deck project is actually underway.

Do I need a permit to build a deck in Los Angeles?
Any deck attached to a house, or standing more than 30 inches above grade, generally needs a building permit and inspection in Los Angeles. Low, freestanding decks near ground level sometimes fall outside that requirement, but checking with the local building department first avoids problems later.
How long does it take to build a deck?
A straightforward ground-level deck usually takes one to two weeks from the first footing to the final board. Multi-level decks, built-in features or permit-required inspections add time, sometimes stretching a project to three or four weeks.
Can a deck be built within a specific budget?
Deck size, decking material and railing choice can all be adjusted to fit a target budget, and that conversation happens before any lumber is ordered. Pressure-treated wood costs less upfront than composite decking, though composite skips the yearly staining.
What kind of warranty or guarantee comes with deck work?
Workmanship is covered for a set period after completion, and manufacturer warranties on materials like composite decking or hardware are passed along separately. Warranty terms are written into the estimate before work starts.
Who handles questions day to day during the project?
One point of contact handles scheduling and questions for the length of a deck project, rather than switching between different people. That contact is reachable by phone or on site throughout the build.
What decking materials are typically used?
Pressure-treated pine, cedar, redwood and composite brands like Trex and TimberTech are all used regularly, each with different upkeep and price points. Composite costs more upfront but doesn't require restaining, while wood decking is cheaper initially but requires sealing every couple of years.
Can the yard still be used while a deck is being built?
Most of the yard stays usable during construction, though the immediate work area needs to stay clear for safety and material staging. Access to the house through the deck area may be limited for a few days during framing.
How should the site be prepared before work starts?
Clearing furniture, planters and anything stored under an existing deck makes the first day of work faster. Access for a truck or trailer, and space to stage lumber, should also be worked out ahead of the start date.
What happens if rot or damage is found once the old deck comes out?
Rotted ledger boards, damaged rim joists or undersized framing found once demolition starts get flagged before any new construction covers them up. Those repairs are quoted separately and explained before work continues, rather than buried in the original price.
How should a finished deck be maintained?
Wood decking requires resealing every one to three years depending on sun exposure, with a west-facing deck in Los Angeles requiring it more often than a shaded one. Composite decking mainly requires regular washing to keep dirt out of the board grain, with no staining required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (213) 444-5196